Our single-storey steel workshops are built of high-quality steel with exceptional durability and resistance to severe weather, corrosion and seismic activity. The simple, single-layer design makes it easy to install and maintain, with flexible customization options to meet your specific needs.
-Much like a through-truss bridge, except that the truss can be a higher, deeper segmental curve
-Suitable for 50m - 150m spans
-Attractive
-Can be constructed on less robust foundations e.g. atop elevated piers/areas of uneven soil
-Can be pre-fabricated offsite and hauled or lifted into place
PARAMETER | |
Brand | ZHUOPIN |
Standard | GB Standard |
Certificates | ISO9001 |
Material Grade | Q235 / Q355 |
Type | Heavy Steel Structure |
Coating Treatment | Painted & Hot dip galvanized |
ZHUOPIN Steel Bowstring Girder Bridge
-Much like a through-truss bridge, except that the truss can be a higher, deeper segmental curve
-Suitable for 50m - 150m spans
-Attractive
-Can be constructed on less robust foundations e.g. atop elevated piers/areas of uneven soil
-Can be pre-fabricated offsite and hauled or lifted into place
Advantages of steel structure bridges
1. The construction period is extremely short, and the actual construction period can be completed within a few days. Because all structural components are prefabricated in the factory, they can be pulled to the site for hoisting.
2. Easy to disassemble. If it needs to be removed later, the bolts can be removed directly, and all the steel can be reused for other buildings.
3. The appearance is light and beautiful.
4. Post-processing is convenient. For example, you need to add components to it and weld them on.
Which bridge is right for you?
Bridge Advice
When designing the construction of a new bridge, there are many considerations to be taken into place, but ultimately the span of the area to be bridged is important to ensure the right materials are chosen for the construction.